Friday, 20 March 2015

WEEKLY PRODUCTION LOG: Week8

This week me and Aisha were just brushing up any loose bits to the music video. We had to line up everything to make it even more precise. At the beginning of the music video, there was sound that was really loud then when it cut to a different scene which was also outside, it went really quiet. To change this so that it would fit better, we got a piece of audio from another clip and slowed it down to fit the length of 10 seconds then placed it over the three video slips which it needed to be. This fit really well even though it was slowed down. Also during the audio, we left in a natural sound from recording which was some bird noises. At first it was an accident but we didn’t realize until the end that it fit really nicely with the tempo and area of the song. We showed it to miss and she said that the audio was all really nice but there was still a few bits of lip synching that was a little off. We had to then try and match everything up as precise as we can. To do this to the best we could, we expanded the image and then synched it. This was to get a better view of Theo’s singing and to match it more precisely to the audio track. The last thing we had to do was export the video as it was complete. This took a while as it had to go over a 3 minute video. As it was taking a while, we were able to set up the saving area and then let it export and leave.

No comments:

Post a Comment